Select Application Type
Missing applications-application-type image
Below is a list of the Application types that you can lodge online. Please click on Statutory Planning box to view the list, select the required application type and click the Next button to continue.
Infrastructure (Asset Protection /Legal Point of Discharge & other Developments))
 Application TypesInstructions
Asset ProtectionAn Asset Protection Permit is required under Council’s Community Local Law 2023 and must be obtained before commencing works. If the work is on an arterial road (managed by VicRoads), or trees or vegetation may be impacted by the works, a planning permit may be required prior to apply for an Asset Protection Permit. If you are unsure if a planning permit is required, call our Planning unit on (03) 5422 0333.
Build over easementThis is not an application for a building permit. This must be lodged separately.
Legal Point of DischargeAs per Building Act 1993 and Building Regulations 2018 – R133
Development and Major ProjectsFor subdivision and development authorised by a Planning Permit, a Functional Layout Plan (FLP), detailed Engineering Plans and a Construction Management Plan (CMP) must be submitted for Council’s review and approval as required by the Planning Permit condition/s.

Please note that Council will not commence assessment of the FLP, Engineering Plans and CMP until any required secondary consent under the Planning Permit has been formally endorsed by the Planning Department.
Traffic Management Plans Review RequestFor any activity within the public road reserve that impacts a road, street, lane, or walkway, a Traffic Management Plan (TMP) is required.
Septic Tank Systems
 Application TypesInstructions
Install a New Septic SystemApplication to install a septic system
Major Alteration to a Septic SystemApplication for a Major Alteration to a septic system
Minor Alteration to a Septic SystemApplication for a Minor Alteration to a septic system
Replace Septic SystemApplication to replace a septic system
Building Applications
 Application TypesInstructions
Section 80 ApplicationLodge a section 80 to notify Council of your appointment to a project pursuant of s.80 of the Building Act 1983
Private Building Surveyor lodgementsYour lodgement process must include the name of the Applicant. You will be able to attach a copy of the Section 80 Notification
Report and Consent of Council - Siting matters Apply for the report and consent of Council for a siting matter under Part 5 of the Building Regulations 2018.
Report and Consent Section 29A DemolitionApply for the report and consent of Council for proposed demolition work.
Report and Consent Non Siting MattersApply for the report and consent of Council to build on flood prone or designated land.
Report and Consent for Protection of the Public (116)Apply for the report and consent of Council for precautions over the street alignment.
Statutory Planning
 Application TypesInstructions
Application for Development PermitDevelopment Permit may include any of the following activities, Building and Works, Earthworks, Vegetation Removal, Signage, more than one dwelling and Industrial Development.
Application for Use only PermitUse may include an application to waiver car parking requirements, medical centres, offices, motor vehicle repairs, Liquor Licence may include a new licence or variation or change of category to a liquor licence etc.
Application for Use and Development PermitUse and Development Permit (eg: use and development of a medical centre and liquor licences) including combined application types.
Application for Single dwelling developmentDevelopment associated with single dwelling - to develop land ancillary to the use of an existing dwelling (such as to construct an outbuilding and or to carry out works) or to use and develop land for a single dwelling per lot.
Application for Development and Subdivision PermitDevelopment and Subdivision Permit may include any of the following, construction of multiple dwellings and subdivision, multi lot subdivisions and earthworks and subdivision and removal of native vegetation.
Application for Removal of Restrictive CovenantRemoval of Restrictive Covenant - to remove a restriction (within the meaning of the Subdivision Act 1988) over land if the land has been used or developed for more than two years before the date of the application in a manner which would be lawful under the Act but for the existence of the restriction.
Application for Subdivision PermitSubdivision Permit may include any of the following activities, multi lot subdivision, subdivision of buildings and/or realignment of a common boundary or to consolidate two lots or more.
Application to Create/Vary Restriction/
Right of Way (ROW) or Easement
(other than a Right of Way)
Removal of Restrictive Covenant - to remove a restriction (within the meaning of the Subdivision Act 1988) over land if the land has been used or developed for more than two years before the date of the application in a manner which would be lawful under the Act but for the existence of the restriction.

Easement other than a Right of Way (ROW)- to create, vary or remove an easement other than a right of way or to vary or remove a condition in the nature of an easement (other than a right of way) in a Crown grant.
VicSmart ApplicationsVicSmart
Event Permits
 Application TypesInstructions
Apply for events permit